| Modernization of power generation in MOST – KOMOŘANY (EKY III) |
| 2007 - 2010 |
| United Energy právní nástupce, a.s. |
| Construction of a new conventional power generation unit of 165 MW electric power |
- tender documentation for selection of the chief designer
|
- commercial and technical support of the contracting entity during tender procedure for selection of the chief designer
|
- tender documentation for selection of the contractor of the main generating unit (HVB)
|
- commercial and technical support of the contracting entity during tender procedure for selection of the main unit contractor
|
- *Above-the-threshold public contract, Tender procedure suspended by the contracting entity
|
| PRUNÉŘOV power plant 2, unit B22, 210 MW - Modernization of TG22 turbine (replacement of MP and HP part) |
| 2009 |
| ČEZ, a. s. |
- technical part of the tender documentation
|
|
| TISOVÁ power plant, unit 6, 100 MW - Modernization of TG6 (replacement of MP and HP part) |
| 2009 |
| ČEZ, a. s. |
- preparation of the technical part of the tender documentation
|
|
| POŘÍČÍ power plant - Reconstruction of low-pressure part of TG1 in EPO 2 |
| 2006 |
| ČEZ, a. s. |
- technical part of the tender documentation
|
|
| LEDVICE power plant - Regeneration and condensation systems adjustments of unit B4 |
| 2006 |
| ČEZ, a. s. |
- technical part of the tender documentation
|
|
| LEDVICE power plant - Installation of the new steam reducing and cooling station RCHS B4 for winter district heating |
| 2006 |
| ČEZ, a. s. |
- commercial/legal part of tender documentation
|
|
| LEDVICE power plant, unit4, 110 MW - Replacement of TG4 turbine and unit 4 overhaul |
| 2006 |
| ČEZ, a. s. |
- building permit documentation
|
|
| TUŠIMICE power plant II - Comprehensive repairs of ETU 2 |
| 2004 |
| ČEZ, a. s. |
- consulting and advisory services in project preparation
|
|
| LEDVICE power plant, unit B4, 110 MW - Replacement of TG4 turbine |
| 2004 |
| ČEZ, a. s. |
- technical part of the tender documentation
|
|
| Operator's control system for STE, a.s. |
| 2004 |
| STE a.s. |
- technical part of the tender documentation
|
|
| POŘÍČÍ power plant - Reconstruction of the high-pressure part of the TG3 turbo generator |
| 2003 |
| ČEZ, a. s. |
- technical part of the tender documentation
|
|
| PRUNÉŘOV power plant, 5x210 MW - Project „Severní lom“ |
| 2001 - 2002 |
| ČEZ, a. s. |
- consulting and advisory services in tendering procedure
|
|
| TUŠIMICE power plants, 4x200 MW - Filtration plant |
| 2001 - 2002 |
| ČEZ, a. s. |
|
- support to the contracting entity during tender porcedure
|
|
| DĚTMAROVICE power plant, 4x200 MW - Modernization of instrumentation and control system (I&C), units 1-4 |
| 1994 - 2001 |
| ČEZ, a. s. |
| Replacement of the original I&C system by a new digital distributed control system (DCS) incl. related upgrades of control rooms |
- plant I&C design basis (detailed input data for the selected contractor's detail design)
|
|
- evaluation of bids and preparation of clean copy of the contract
|
- technical assistance to the purchaser in checks of contractor's fulfillment of contractual commitments during project implementation - documentation, erection, tests and commissioning, defects and backlogs management
|
|
| CHVALETICE power plant, 4x200 MW - Modernization of instrumentation and control system (I&C), units B1, B3 and B4 |
| 1994 - 2000 |
| ČEZ, a. s. |
| Replacement of the original I&C system by a new digital distributed control system (DCS) incl. related upgrades of control rooms |
|
- commercial, technical and administration support to the contracting entity during tender procedure
|
- technical assistance to the purchaser in checks of contractor's fulfillment of contractual commitments during project implementation - documentation, erection, tests and commissioning, defects and backlogs management
|
|
| ČEZ, a. s. - Condition survey of instrumentation and control systems at hydroelectric and fossile power stations of ČEZ, a. s. |
| 1997 - 1999 |
| ČEZ, a. s. |
- analysis of condition, range of equipment and future usability of I&C and electrical systems on conventional and hydroelectric power stations of ČEZ, a. s.
|
- creation of an application software for analysis data processing
|
- digitizing of the I&C diagrams of the conventional and hydroelectric power plants of ČEZ, a. s. and their integration into the newly created information system
|
- digitizing of the single pole diagrams of the electrical part of the conventional and hydroelectric power plants of ČEZ, a. s. and their integration into the newly created information system
|
|
| PRUNÉŘOV power plant, 5x210 MW - Control of the island operation of the plant units |
| 1997 - 1999 |
| ČEZ, a. s. |
| Addition of the function of the island operation control into the instrumentation and control system WDPF II |
|
- support to the contracting entity during tender porcedure
|
- technical assistance in project execution
|
|
| ČEZ, a. s. - Project "Improvement of efficiency and reliability of ČEZ, a. s. power stations" |
| 1994 - 1999 |
| ČEZ, a. s. |
| Preparation and administration of "Improvement of efficiency and reliability of ČEZ, a. s. power stations" project funded by the World Bank and encompassing a wide range of modernization projects in ČEZ, a.s. power stations in this Reference Sheet hereinafter listed with the note "World Bank". |
- commercial and technical services for the ČEZ, a. s. project management team during planning stage and implementation of the project
|
|
| PRUNÉŘOV power plant, 5x210 MW - Modernization of instrumentation and control system (I&C), units B21-B25 |
| 1994 - 1999 |
| ČEZ, a. s. |
| Replacement of the original I&C system by a new digital distributed control system (DCS) incl. related upgrades of control rooms |
- plant I&C design basis (detailed input data for the selected contractor's detail design)
|
|
- commercial, technical and administration support to the contracting entity during tender procedure
|
- technical assistance to the purchaser in checks of contractor's fulfillment of contractual commitment during project implementation - documentation, erection, tests and commissioning, defects and backlogs management
|
|
| PRUNÉŘOV power plant - Modernization of the in strumentation and control system (I&C) of the district heating systems of the plant |
| 1998 |
| ČEZ, a. s. |
|
|
| PRUNÉŘOV power plant - Study of the heat accumulation capacity of the EPRU plant district heating network |
| 1998 |
| ČEZ, a. s. |
|
|
| TUŠIMICE power plant I, 3x110 MW - Architectural layout of control rooms |
| 1998 |
| ČEZ, a. s. |
- architectural design of the coal handling control room and of the common control room of power station's units
|
|
| LEDVICE power plant - Reconstruction of Zálezly pumping station |
| 1998 |
| ČEZ, a. s. |
- commercial/legal part of tender documentation
|
|
| LEDVICE power plant, B2, B3, B4 3x110 MW - Deliveries of partial process systems (14 projects) |
| 1998 |
| ČEZ, a. s. |
- commercial/legal part of tender documentation
|
|
| LEDVICE power plant - Instrumentation and control system (I&C) of the chemical water treatment plant |
| 1998 |
| ČEZ, a. s. |
- commercial/legal part of tender documentation
|
|
| LEDVICE power plant, B2 a B3, 2x110 MW - Reconstruction of UHV outgoing feeder bays |
| 1998 |
| ČEZ, a. s. |
- commercial/legal part of tender documentation
|
|
| LEDVICE power plant - Reconstruction of Zálezly pumping station |
| 1998 |
| ČEZ, a. s. |
- support to the contracting entity during tender porcedure
|
|
| LEDVICE power plant, B2 a B3, 2x110 MW - Reconstruction of UHV outgoing feeder bays |
| 1998 |
| ČEZ, a. s. |
- support to the contracting entity during tender porcedure
|
|
| LEDVICE power plant - Instrumentation and control system (I&C) of the chemical water treatment plant |
| 1998 |
| ČEZ, a. s. |
- support to the contracting entity during tender porcedure
|
|
| LEDVICE power plant, B2, B3, B4 3x110 MW - Deliveries of partial process systems (14 projects) |
| 1998 |
| ČEZ, a. s. |
- evaluation of bids and preparation of clean copy of the contract
|
|
| PRUNÉŘOV power plant I, 4x110 MW - Replacement of the instrumentation and control system (I&C) |
| 1997 - 1998 |
| ČEZ, a. s. |
|
|
|
| TUŠIMICE power plant I, 3x110 MW - Modernization of instrumentation and control system (I&C) |
| 1997 - 1998 |
| ČEZ, a. s. |
|
- commercial and technical support of the contracting entity during tender procedure
|
|
| PRUNÉŘOV power plant, 5x210 MW - KKS coding of selected parts of power generation and district heating systems of the plant |
| 1994 - 1998 |
| ČEZ, a. s. |
- KKS coding of the process equipment and its inclusion into process diagrams and databases of instrumentation, drives, signal lists etc.
|
|
| TR CHOTĚJOVICE 220/110 kV - Modernization of the control system |
| 1997 |
| SČE a.s. |
- tender documentation evaluation
|
- evaluation of submitted bids
|
- draft of the final (recommending) report
|
|
| Energetický dispečink STE a.s. - Modernization of the control center control system. |
| 1997 |
| STE a.s. |
|
|
| LEDVICE power plant, B2 a B3, 2x110 MW - Inside fly-ash removal system - mixing water |
| 1997 |
| ČEZ, a. s. |
- commercial/legal part of tender documentation
|
- support to the contracting entity during tender porcedure
|
|
| Energetický dispečink STE a.s. - Modernization of the control center control system. |
| 1997 |
| STE a.s. |
- evaluation of bids and preparation of the final report with recommendation of the best bid
|
|
| LEDVICE power plant, B2 and B3, 2x110 MW - Change of the startup burners fuel |
| 1996 - 1997 |
| ČEZ, a. s. |
- commercial/legal part of tender documentation
|
|
| POČERADY power plant, unit B5, 1x200 MW - Modernization of unit no. 5 cooling tower |
| 1996 - 1997 |
| ČEZ, a. s. |
|
|
| POČERADY power plant, unit B5, 1x200 MW - Replacement of the fly-ash electrostatic precipator on unit no. 5 |
| 1996 - 1997 |
| ČEZ, a. s. |
|
|
| LEDVICE power plant - Outside fly-ash removal system - mixing facility |
| 1996 - 1997 |
| ČEZ, a. s. |
- commercial/legal part of tender documentation
|
|
| POČERADY power plant, unit B5, 1x200 MW - Replacement of the fly-ash electrostatic precipator on unit no. 5 |
| 1996 - 1997 |
| ČEZ, a. s. |
- commercial and technical support of the contracting entity during tender procedure
|
|
| LEDVICE power plant, B2 and B3, 2x110 MW - Change of the startup burners fuel |
| 1996 - 1997 |
| ČEZ, a. s. |
- support to the contracting entity during tender porcedure
|
|
| LEDVICE power plant - Outside fly-ash removal system - mixing facility |
| 1996 - 1997 |
| ČEZ, a. s. |
- support to the contracting entity during tender porcedure
|
|
| POČERADY power plant, unit B5, 1x200 MW - Modernization of unit no. 5 cooling tower |
| 1996 - 1997 |
| ČEZ, a. s. |
- commercial and technical support of the contracting entity during tender procedure
|
|
| LEDVICE power plant - Outside fly-ash removal system - mixing facility |
| 1996 - 1997 |
| ČEZ, a. s. |
- technical assistance to the purchaser during project supervision
|
|
| TUŠIMICE power plant, 4x200 MW - Modernization of unit instrumentation and control system |
| 1993 - 1997 |
| ČEZ, a. s. |
| Replacement of the original I&C system by a new digital distributed control system (DCS) incl. related upgrades of control rooms |
|
- commercial and technical support of the contracting entity during tender procedure
|
- technical assistance to the purchaser in checks of contractor's fulfillment of contractual commitments during project implementation - documentation, erection, tests and commissioning, defects and backlogs management
|
|
| ČEZ, a. s. - Comparative analysis of distributed control systems for power plant units and common processes control |
| 1996 |
| ČEZ, a. s. |
- comparative analysis preparation
|
|
| LEDVICE power plant, unit B4, 1x110 MW - Modernization (replacement) of generator excitation system |
| 1996 |
| ČEZ, a. s. |
|
- commercial and technical support of the contracting entity during tender procedure
|
|
| LEDVICE power plant, unit B4, 1x110 MW - Reconstruction of unit electrical equipment |
| 1995 - 1996 |
| ČEZ, a. s. |
|
|
| LEDVICE power plant - Outside fly-ash removal system - hydrotransport and stabilized residues stowing |
| 1995 - 1996 |
| ČEZ, a. s. |
- commercial/legal part of tender documentation
|
- support to the contracting entity during tender porcedure
|
|
| LEDVICE power plant, unit B4, 1x110 MW - Reconstruction of unit electrical equipment |
| 1995 - 1996 |
| ČEZ, a. s. |
- commercial, technical and administration support to the contracting entity during tender procedure
|
|
| CHVALETICE power plant, unit B3, 1x200 MW - Modernization of a 200 MW generator |
| 1995 |
| ČEZ, a. s. |
|
|
| CHVALETICE power plant, unit B3, 1x200 MW - Generator circuit-breaker replacement |
| 1995 |
| ČEZ, a. s. |
|
|
| CHVALETICE power plant, unit B3, 1x200 MW - Modernization of a 200 MW generator |
| 1995 |
| ČEZ, a. s. |
- commercial, technical and administration support to the contracting entity during tender procedure
|
|
| CHVALETICE power plant, unit B3, 1x200 MW - Generator circuit-breaker replacement |
| 1995 |
| ČEZ, a. s. |
- commercial, technical and administration support to the contracting entity during tender procedure
|
|
| LEDVICE power plant - Reconstruction of a 6 kV switchgear and of the instrumentation and control system of the central electric control room |
| 1994 - 1995 |
| ČEZ, a. s. |
|
|
| DĚTMAROVICE power plant, 4x200 MW - Boiler sealing reconstruction |
| 1994 - 1995 |
| ČEZ, a. s. |
|
|
| CHVALETICE power plant, unit B3, 1x200 MW - Replacement of 6 kV switchboards incl. circuit breakers |
| 1994 - 1995 |
| ČEZ, a. s. |
|
|
| CHVALETICE power plant, unit B3, 1x200 MW - High pressure heater replacement |
| 1994 - 1995 |
| ČEZ, a. s. |
|
|
| DĚTMAROVICE power plant, 4x200 M - Boiler steam leak detection system by means of acoustic signals |
| 1994 - 1995 |
| ČEZ, a. s. |
|
|
| LEDVICE power plant - Reconstruction of a 6 kV switchgear and of the instrumentation and control system of the central electric control room |
| 1994 - 1995 |
| ČEZ, a. s. |
- commercial, technical and administration support to the contracting entity during tender procedure
|
|
| DĚTMAROVICE power plant, 4x200 MW - Boiler sealing reconstruction |
| 1994 - 1995 |
| ČEZ, a. s. |
- commercial, technical and administration support to the contracting entity during tender procedure
|
|
| DĚTMAROVICE power plant, 4x200 M - Boiler steam leak detection system by means of acoustic signals |
| 1994 - 1995 |
| ČEZ, a. s. |
- commercial, technical and administration support to the contracting entity during tender procedure
|
|
| CHVALETICE power plant, unit B3, 1x200 MW - Replacement of 6 kV switchboards incl. circuit breakers |
| 1994 - 1995 |
| ČEZ, a. s. |
- commercial, technical and administration support to the contracting entity during tender procedure
|
|
| CHVALETICE power plant, unit B3, 1x200 MW - High pressure heater replacement |
| 1994 - 1995 |
| ČEZ, a. s. |
- commercial, technical and administration support to the contracting entity during tender procedure
|
|
| TUŠIMICE power plant - Training simulator at power training centre |
| 1993 - 1995 |
| ČEZ, a. s. |
|
- commercial and technical support of the contracting entity during tender procedure
|
|
| MĚLNÍK power plant, unit B1, 1x110 MW - Reconstruction of the central control room and replacement of the instrumentation and control system of own electric consumption |
| 1994 |
| ČEZ, a. s. |
|
|
| POČERADY power plant, units B3, B4, 2x200 MW - Reconstruction of TG3 electric protections and of output transformers on bi-unit B3 and B4 |
| 1994 |
| ČEZ, a. s. |
- preparation of the technical part of the tender documentation
|
|
| PRUNÉŘOV power plant, 5x210 MW - Reconstruction of the generator excitation system |
| 1994 |
| ČEZ, a. s. |
|
|
| MĚLNÍK power plant, 1x110 MW - Delivery of mazut burners |
| 1994 |
| ČEZ, a. s. |
|
|
| MĚLNÍK power plant, 1x110 MW - Delivery of injection valves |
| 1994 |
| ČEZ, a. s. |
|
- commercial, technical and administration support to the contracting entity during tender procedure
|
|
| MĚLNÍK power plant, 1x110 MW - Delivery of mazut burners |
| 1994 |
| ČEZ, a. s. |
- commercial, technical and administration support to the contracting entity during tender procedure
|
|
| POČERADY power plant, units B3, B4, 2x200 MW - Reconstruction of TG3 electric protections and of output transformers on bi-unit B3 and B4 |
| 1994 |
| ČEZ, a. s. |
- technical assistance in evaluation of bids
|
|
| PRUNÉŘOV power plant, 5x210 MW - Reconstruction of the generator excitation system |
| 1994 |
| ČEZ, a. s. |
- commercial, technical and administration support to the contracting entity during tender procedure
|
|
| LEDVICE power plant - Reconstruction of coal handling, incl. instrumentation and control system |
| 1993 - 1994 |
| ČEZ, a. s. |
|
|
- commercial, technical and administration support to the contracting entity during tender procedure
|
|
| LEDVICE power plant - Plant automated control development concept |
| 1993 |
| ČEZ, a. s. |
|
|
| POČERADY power plant, unit B5, 1x200 MW - Modernization of unit instrumentation and control system (I&C) |
| 1993 |
| ČEZ, a. s. |
| Replacement of the original I&C system by a new digital distributed control system (DCS) incl. related upgrade of the control room |
|
|
| LEDVICE power plant, unit B4, 1x110 MW - Instrumentation and control system of a fluidized bed boiler |
| 1993 |
| ČEZ, a. s. |
- specific parts of tender documentation
|
|
| POČERADY power plant, unit B2, 1x200 MW - Modernization of unit instrumentation and control system (I&C) |
| 1993 |
| ČEZ, a. s. |
| Replacement of the original I&C system by a new digital distributed control system (DCS) incl. related upgrade of the control room |
|
|
| TUŠIMICE power plant, 4x200 MW - Reconstruction of Ljungstroems |
| 1993 |
| ČEZ, a. s. |
|
|
| POČERADY power plant, unit B2, 1x200 MW - Modernization of unit instrumentation and control system (I&C) |
| 1993 |
| ČEZ, a. s. |
| Replacement of the original I&C system by a new digital distributed control system (DCS) incl. related upgrade of the control room |
- commercial and technical support of the contracting entity during tender procedure
|
|
| TUŠIMICE power plant, 4x200 MW - Reconstruction of Ljungstroems |
| 1993 |
| ČEZ, a. s. |
- commercial, technical and administration support to the contracting entity during tender procedure
|
|
| POČERADY power plant, unit B3, 1x200 MW - Modernization of unit instrumentation and control system (I&C) |
| 1992 - 1993 |
| ČEZ, a. s. |
| Replacement of the original I&C system by a new digital distributed control system (DCS) incl. related upgrade of the control room |
|
|
- commercial and technical support of the contracting entity during tender procedure
|
|
| LEDVICE power plant, unit B2, B3, 2x110 MW - Modernization of unit instrumentation and control system |
| 1991 - 1993 |
| ČEZ, a. s. |
| Replacement of the original I&C systems by a new modern distributed control system (DCS) incl. related upgrades of control rooms |
|
- commercial, technical and administration support to the contracting entity during tender procedure
|
- technical assistance to the purchaser in checks of contractor's fulfillment of contractual commitments during project implementation - documentation, erection, tests and commissioning, defects and backlogs management
|
|
| POČERADY power plant, unit B1, 1x200 MW - Modernization of unit instrumentation and control system (I&C) |
| 1992 |
| ČEZ, a. s. |
| Replacement of the original I&C system by a new digital distributed control system (DCS) incl. related upgrade of the control room |
|
- update of process, logic and modulating control diagrams
|
|
| LEDVICE power plant, unit B1, 1x200 MW - Reconstruction of unit instrumentation and control system and of unit electrical equipment |
| 1992 |
| ČEZ, a. s. |
|
|
| POČERADY power plant, unit B1, 1x200 MW - Modernization of unit instrumentation and control system (I&C) |
| 1992 |
| ČEZ, a. s. |
| Replacement of the original I&C system by a new digital distributed control system (DCS) incl. related upgrade of the control room |
- KKS codingof the process equipment
|
|
| POČERADY power plant, unit B6, 1x200 MW - Modernization of unit instrumentation and control system (I&C) |
| 1992 |
| ČEZ, a. s. |
| Replacement of the original I&C system by a new digital distributed control system (DCS) incl. related upgrade of the control room |
|
|
| LEDVICE power plant, unit B1, 1x200 MW - Reconstruction of unit instrumentation and control system and of unit electrical equipment |
| 1992 |
| ČEZ, a. s. |
|
|
|