| Study "Development of I&C systems in TOT and KTY plants" |
| 2015 - now |
| TO Servisní s.r.o. |
- study preparation of I&C systems development
|
|
| STRAKONICE heating plant - Reconstruction of boilers K1 and K2 with use of fluid technologies |
| 2009 - now |
| Teplárna Strakonice, a.s. |
|
- support to the contracting entity during tender porcedure
|
- participation in the purchaser's technical supervision of the project
|
- *Above-the-threshold public contract, Subsidy from SFP (State environmental fund of the Czech republic), Negotiated procedure with publication
|
| Greening of atecká teplárenská, a.s. district heating system - reconstruction of boilers K1 a K2 and construction of flue gas desulphurization system |
| 2014 - 2015 |
| atecká teplárenská, a.s. |
| Reconstruction of K1 and K2 boilers into boilers with fluid technology and construction of a condiutioned sorption-type desulphurization system. Subcontractor of the commercial part of tender documents for TI Centrum. |
|
- qualification documentation
|
- invitation to submit tenders
|
- commercial part of the tender documentation
|
- administration of the tender procedure
|
- *Subsidy from SFP (State environmental fund of the Czech republic), Negotiated procedure with publication
|
| Emission reduction in Ostrov - District heating reconstruction, phase 4 - hot water pipeline to the town including main substation in heating plant |
| 2014 |
| Ostrovská teplárenská, a.s. |
|
- qualification documentation
|
- invitation to submit tenders
|
|
- administration of the tender procedure
|
- *Subsidy from SFP (State environmental fund of the Czech republic), Negotiated procedure with publication
|
| Elimination of the steam duct east (V3) |
| 2013 - 2014 |
| Teplárna Strakonice, a.s. |
| Transition from steam to hot water heat distribution in the district heating system in Strakonice, i. e. replacement of existing steam pipes by new pre-insulated hot water pipes and replacement of existing steam/water substations by house water/water substations under the terms of tender documentation, |
|
|
- administration of the tender procedure
|
- *Subsidy from SFP (State environmental fund of the Czech republic), Open procedure
|
| Emission reduction in Ostrov - District heating reconstruction, phase 3.3 - reconstruction five substations |
| 2014 |
| Ostrovská teplárenská, a.s. |
| Reconstruction of 2 district heating substations of unit thermal power of 800/1000 kW for heating and 400/500 kW for household use including connections in total length of cca 320 m within the scope of the transition from steam distribution system to hot water distribution system by means of replacement of obsolete heat mains while improving greatly operating efficiency and environmental parameters of the heat production and distribution in the district heating system in the town of Ostrov. |
|
|
- *Subsidy from SFP (State environmental fund of the Czech republic), Open procedure
|
| Greening of ATECKÁ TEPLÁRENSKÁ, A.S. district heating system - VS 4 substation area |
| 2014 |
| atecká teplárenská, a.s. |
| Replacement of existing four pipe steam district heating mains by new hot water pre-insulated pipes in length of cca 450 m and construction of 11 compact district heating substations of heating/heated water for household use thermal power of 70-230 kW/110-210 kW in the area of VS 4 substation. |
|
|
- *Subsidy from SFP (State environmental fund of the Czech republic), Open procedure
|
| Emission reduction in Ostrov - District heating reconstruction, phase 3.2 and reconstruction five substations |
| 2013 |
| Ostrovská teplárenská, a.s. |
| Reconstruction of existing steam district heating pipes in total length of 1.300 m including connections to the district heating network and subsequent reconstruction of five adjacent heat substations of unit thermal power 500-1720 kW for heating and 100-600 kW for household use |
|
|
- *Subsidy from SFP (State environmental fund of the Czech republic), Open procedure
|
| STRAKONICE - Repairs and modernization of district heating network |
| 2010 - 2011 |
| Teplárna Strakonice, a.s. |
| (4 projects) |
- commercial/legal part of tender documentation and assistance to the contracting entity during award procedure
|
- *2 projects with subsidy from OPPI (Operational Programme Enterprise and Innovations)
|
| STRAKONICE heating plant - Construction of a mobile facility for fine anorganic waste materials processing for manufacture of light artificial gravel |
| 2010 - 2011 |
| Teplárna Strakonice, a.s. |
- commercial/legal part of tender documentation and assistance to the contracting entity during award procedure
|
- *Subsidy from OPPI (Operational Programme Enterprise and Innovations)
|
| PÍSEK heating plant - District heating piping in the Z Tylova heat substation area in Písek |
| 2010 - 2011 |
| Teplárna Písek, a.s. |
|
- bid evaluation guidelines
|
- support to the contracting entity during tender porcedure
|
- *Subsidy from SFP (State environmental fund of the Czech republic)
|
| Plzeňská energetika - Construction of TG11 turbine |
| 2008 - 2010 |
| Plzeňská energetika a.s. |
|
- preparation of qualification and bid evaluation guidelines
|
- support to the contracting entity during tender porcedure
|
- *Above-the-threshold public contract, Project not implemented by the investor
|
| STRAKONICE - Repairs and modernization of district heating network |
| 2009 |
| Teplárna Strakonice, a.s. |
| (3 projects) |
- commercial/legal part of tender documentation and assistance to the contracting entity during award procedure
|
|
| STRAKONICE - Repairs and modernization of coal feeding ducts |
| 2009 |
| Teplárna Strakonice, a.s. |
- commercial/legal part of tender documentation and assistance to the contracting entity during award procedure
|
|
| STRAKONICE heating plant - Erection and furnishing of the training center |
| 2009 |
| Teplárna Strakonice, a.s. |
- commercial/legal part of tender documentation and assistance to the contracting entity during award procedure
|
|
| Příbramská teplárenská - I&C modernization in Příbramská teplárenská a.s. |
| 2009 |
| Příbramská teplárenská a.s. |
|
- support to the contracting entity during tender porcedure
|
|
| EKY III KOMOŘANY power plant - Study of I&C systems development in Komořany heating plant |
| 2008 |
| United Energy právní nástupce, a.s. |
- study preparation of I&C systems development
|
|
| STRAKONICE - Repairs and modernization of district heating network |
| 2008 |
| Teplárna Strakonice, a.s. |
| (4 projects) |
- commercial/legal part of tender documentation and assistance to the contracting entity during award procedure
|
|
| STRAKONICE heating plant, a.s. - Sokolovna Strakonice, district heating connection and substation |
| 2008 |
| Teplárna Strakonice, a.s. |
- commercial/legal part of tender documentation and assistance to the contracting entity during award procedure
|
|
| STRAKONICE - Repairs and modernization of district heating network |
| 2008 |
| Teplárna Strakonice, a.s. |
- commercial/legal part of tender documentation and assistance to the contracting entity during award procedure
|
|
| STRAKONICE heating plant - Replacement of the bottom economizer and replacement of boiler K3 air heaters |
| 2007 |
| Teplárna Strakonice, a.s. |
- commercial/legal part of tender documentation and assistance to the contracting entity during award procedure
|
|
| STRAKONICE - Repairs and modernization of district heating network |
| 2007 |
| Teplárna Strakonice, a.s. |
| (2 projects) |
- commercial/legal part of tender documentation and assistance to the contracting entity during award procedure
|
|
| STRAKONICE heating plant - Reconstruction of the fine cooling circuit |
| 2007 |
| Teplárna Strakonice, a.s. |
- commercial/legal part of tender documentation and assistance to the contracting entity during award procedure
|
|
| STRAKONICE heating plant - Replacement of TN2 turbo feed pump |
| 2007 |
| Teplárna Strakonice, a.s. |
- commercial/legal part of tender documentation and assistance to the contracting entity during award procedure
|
|
| OZ - ACTHERM, CHOMUTOV - Reconstruction of TG 1 turbine - 12 MW |
| 2006 - 2007 |
| ACTHERM, spol. s r.o. |
|
- preparation of qualification and bid evaluation guidelines
|
- support to the contracting entity during tender porcedure
|
|
| STRAKONICE heating plant - Repairs and modernization of the chemical water treatment plant demineralization and condensate treatment |
| 2004 - 2007 |
| Teplárna Strakonice, a.s. |
|
- commercial and technical support of the contracting entity during tender procedure
|
- technical assistance in project execution
|
- *Above-the-threshold public contract
|
| ČESKÝ KRUMLOV DOMORADICE - Reconstruction of district heating plant |
| 2006 |
| CARTHAMUS a.s. |
- I&C part of the basic design (for HDE)
|
|
| STRAKONICE heating plant - Repairs of railway siding |
| 2006 |
| Teplárna Strakonice, a.s. |
- commercial/legal part of tender documentation and assistance to the contracting entity during award procedure
|
|
| STRAKONICE - Repairs and modernization of district heating network |
| 2006 |
| Teplárna Strakonice, a.s. |
| (4 projects) |
- commercial/legal part of tender documentation and assistance to the contracting entity during award procedure
|
|
| STRAKONICE heating plant - Delivery of self consumption transformers T6, T7, T8 |
| 2006 |
| Teplárna Strakonice, a.s. |
- commercial/legal part of tender documentation and assistance to the contracting entity during award procedure
|
|
| KOMOŘANY heating plant - Reconstruction of the back-pressure turbo-generator set TG10 |
| 2004 - 2006 |
| United Energy, a.s. |
|
- commercial and technical support of the contracting entity during tender procedure
|
- *Above-the-threshold public contract
|
| TÁBOR heating plant - Construction of boiler K7 and TG2 |
| 2005 - 2006 |
| Teplárna Tábor, a.s. |
|
- technical assistance in planning and execution of tendering procedure according to law no. 40/2004 Coll.
|
- *Above-the-threshold public contract
|
| STRAKONICE heating plant - Replacement of the upper economizer of boiler K3 |
| 2005 |
| Teplárna Strakonice, a.s. |
- commercial/legal part of tender documentation and assistance to the contracting entity during award procedure
|
|
| STRAKONICE heating plant - Completion of plant electrical systems to enable turbo generator TG2 island operation |
| 2005 |
| Teplárna Strakonice, a.s. |
- commercial part of the tender documentation and assistance to the contracting entity during award procedure
|
|
| STRAKONICE heating plant - Repairs of backup transformer T13 R |
| 2005 |
| Teplárna Strakonice, a.s. |
- commercial/legal part of tender documentation and assistance to the contracting entity during award procedure
|
|
| STRAKONICE heating plant - Repairs of the casing of the coal feeding bridges M4-M7 |
| 2005 |
| Teplárna Strakonice, a.s. |
- commercial/legal part of tender documentation and assistance to the contracting entity during award procedure
|
|
| STRAKONICE heating plant - Repairs of a reinforced concrete stack 147,5 m high |
| 2005 |
| Teplárna Strakonice, a.s. |
- commercial/legal part of tender documentation and assistance to the contracting entity during award procedure
|
|
| STRAKONICE heating plant - Condenser continuous cleaning system |
| 2005 |
| Teplárna Strakonice, a.s. |
- commercial/legal part of tender documentation and assistance to the contracting entity during award procedure
|
|
| STRAKONICE - Repairs and modernization of district heating network |
| 2005 |
| Teplárna Strakonice, a.s. |
| (4 projects) |
- commercial/legal part of tender documentation and assistance to the contracting entity during award procedure
|
|
| Plzeňská teplárenská - Construction of unit K7 and TG3 |
| 2005 |
| Plzeňská teplárenská, a.s. |
|
- technical assistance in planning and execution of tendering procedure according to law no. 40/2004 Coll.
|
- *Above-the-threshold public contract
|
| KOMOŘANY heating plant - Study of service life and future development of I&C system of the plant |
| 2004 |
| United Energy, a.s. |
- Study "Life expectancy and further development of I&C systems in Teplárna Komořany, a.s. plant"
|
|
| STRAKONICE heating plant - Public procurement guidlines |
| 2004 |
| Teplárna Strakonice, a.s. |
- public procurement guidelines in accordance with act no. 40/2004 Coll. on public contracts
|
|
| STRAKONICE heating plant - Central cleaning system of the work surfaces and of the process equipment |
| 2004 |
| Teplárna Strakonice, a.s. |
|
- commercial and technical support of the contracting entity during tender procedure
|
|
| STRAKONICE heating plant - Repairs and modernization of the chemical water treatment plant clarification and filtration |
| 2002 - 2003 |
| Teplárna Strakonice, a.s. |
|
- commercial and technical support of the contracting entity during tender procedure
|
- technical assistance in project execution
|
|
| STRAKONICE heating plant - Repairs and modernization of dry fly-ash off-take |
| 2002 - 2003 |
| Teplárna Strakonice, a.s. |
|
- commercial and technical support of the contracting entity during tender procedure
|
- technical assistance in project execution
|
|
| STRAKONICE heating plant - Implementation study of repairs and reconstruction of the district heating network and district heating substations |
| 2001 - 2002 |
| Teplárna Strakonice, a.s. |
|
|
| STRAKONICE heating plant - Tagging of the plant equipment with an alphanumeric code |
| 2001 - 2002 |
| Teplárna Strakonice, a.s. |
- KKS coding of the process equipment and its inclusion into process diagrams and databases of instrumentation, drives, signal lists etc.
|
|
| PÍSEK heating plant, a.s. - Control system of the district heating of the town of Písek |
| 1998 - 2002 |
| Teplárna Písek, a.s. |
|
- commercial and technical support of the contracting entity during tender procedure
|
- technical assistance to the purchaser in checks of contractor's fulfillment of contractual commitments during project implementation - documentation, erection, tests and commissioning, defects and backlogs management
|
|
| STRAKONICE heating plant - Manual (public procurement guidlines) |
| 2001 |
| Teplárna Strakonice, a.s. |
- public procurement guidelines in accordance with amendments 28/2000 Coll. and 142/2001 Coll. to the act no. 199/1994 Coll. on public contracts
|
|
| PÍSEK heating plant - Modernization of instrumentation and control system (I&C) |
| 1997 - 2001 |
| Teplárna Písek, a.s. |
| Replacement of the original I&C system by a new digital distributed control system (DCS) incl. related upgrade of the control room |
|
- commercial and technical support of the contracting entity during tender procedure
|
- technical assistance to the purchaser in checks of contractor's fulfillment of contractual commitments during project implementation - documentation, erection, tests and commissioning, defects and backlogs management
|
|
| STRAKONICE heating plant - Construction of cooling towers |
| 1999 - 2000 |
| Teplárna Strakonice, a.s. |
|
- commercial and technical support of the contracting entity during tender procedure
|
- technical assistance in project execution
|
|
| STRAKONICE heating plant - Repairs and modernization of turbo generator TG 2 |
| 1995 - 2000 |
| Teplárna Strakonice, a.s. |
| Repairs and modernization of a TG incl. new turbine of 20 MW |
|
|
| STRAKONICE heating plant - Modernization of instrumentation and control system (I&C) |
| 1995 - 2000 |
| Teplárna Strakonice, a.s. |
| Replacement of the original I&C system by a new digital distributed control system (DCS) incl. related upgrades of control rooms |
|
- commercial and technical support of the contracting entity during tender procedure
|
|
| STRAKONICE heating plant - Repairs and modernization of turbo generator TG 2 |
| 1995 - 2000 |
| Teplárna Strakonice, a.s. |
| Repairs and modernization of a TG incl. new turbine of 20 MW |
- commercial and technical support of the contracting entity during tender procedure
|
|
| STRAKONICE heating plant - Modernization of instrumentation and control system (I&C) |
| 1995 - 2000 |
| Teplárna Strakonice, a.s. |
| Replacement of the original I&C system by a new digital distributed control system (DCS) incl. related upgrades of control rooms |
- technical assistance to the purchaser in checks of contractor's fulfillment of contractual commitments during project implementation - documentation, erection, tests and commissioning, defects and backlogs management
|
|
| STRAKONICE heating plant - Repairs and modernization of turbo generator TG 2 |
| 1995 - 2000 |
| Teplárna Strakonice, a.s. |
| Repairs and modernization of a TG incl. new turbine of 20 MW |
- technical assistance to the purchaser in checks of contractor's fulfillment of contractual commitments during project implementation - documentation, erection, tests and commissioning, defects and backlogs management
|
|
| KOMOŘANY heating plant - Turbogenerator TG4, 5, 6 I&C system technical condition analysis |
| 1999 |
| První severozápadní teplárenská a.s. |
- analysis of turbogenerator TG 4, 5 and 6 I&C as-is condition
|
|
| Plzeňská teplárenská - Construction of a new heating plant cogeneration unit with a fluidized bed boiler of 125 MWt thermal power |
| 1996 - 1997 |
| Plzeňská teplárenská, a.s. |
|
- documentation for planning permission
|
|
- commercial and technical support of the contracting entity during tender procedure
|
|
| Parovod VŘESOVÁ - NEJDEK - Construction of Vřesová - Nejdek steam pipeline |
| 1994 - 1995 |
| Město Nejdek |
|
- commercial, technical and administration support to the contracting entity during tender procedure
|
|
|